
19
PPR 1 A1
GB
MT
♦ Immerse the intake pipe in water and pull/push the plunger back and
forth about fi ve times.
♦ Now remove the intake pipe from the fi lling valve .
♦ Immerse the fi lling valve and the paint roller bracket in water and
pull/push the plunger
back and forth again about fi ve times.
♦ Then remove the paint roller bracket .
♦ Immerse the fi lling valve completely in water and pull/push the plunger
back and forth again about fi ve times.
♦ Undo the large cap nut from the knob and pull the plunger out of the paint
cylinder
. Clean all parts with water.
♦ For long-term storage, please grease the O-rings on the front of the plunger
and the seals on the paint roller bracket
evenly with petroleum jelly, for
example.
Cleaning the fi lling valve
♦ Undo the cap nut
D
on the fi lling valve by turning it anticlockwise.
♦ Remove the lock washer
E
and the rubber valve
F
from the valve housing.
♦ Clean the individual parts with water.
♦ Replace the rubber valve
F
and the lock washer
E
.
♦ Screw the cap nut
D
fi rmly onto the valve housing again.
D
E
F
IB_104464_PPR1A1_LB5.indb 19 02.12.14 15:46
Kommentare zu diesen Handbüchern